New Dock for Lake Jennings Marina
Bellingham Marine has replaced a 25-year old wooden boat dock at Lake Jennings reservoir in San Diego County, California, with a match-cast concrete system. The project included the main dock (184x8 feet), 20 fingers (14x3 feet) and a platform (23 feet square) for a 12x10-foot building. "It was important for Lake Jennings to have a durable product in there, since this is a drinking water reservoir. They wanted something that would last and not leach into the environment," said Brian Hylland, project development manager for Bellingham Marine's Southwest division. The modules for the concrete dock were manufactured at Bellingham's plant in Dixon, California, and shipped to the site. Bellingham Marine built the new docks in the water alongside the existing dock, then floated the old dock
42 Marina Dock Age November/December 2020 Bellingham Marine has replaced an outdated wooden boat dock with a new concrete system at Lake Jennings in San Diego County, California.
Previous Page